UNT Libraries Government Documents Department - 7,041 Matching Results

Search Results

Primary view of 1/2 Sintering of Mullite-Containing Materials: I. Effect of Composition
Sacks, Michael D. & Pask, Joseph A.
December 1, 1981
Primary view of 3. 6 simplified methods for design
Nickell, R.E. & Yahr, G.T.
January 1, 1981
Primary view of 3-D Nonlinear Calculations of Resistive Tearing Modes
Hicks, H. R.; Holmes, J. A.; Lee, D. K.; Carreras, B. & Waddell, B. V.
March 1, 1981
Primary view of T-3 electron-beam-excited laser system
Klein, R. A.
February 1, 1981
Primary view of 3-megajoule heavy-ion fusion driver
Faltens, A.; Hoyer, E. & Keefe, D.
June 1, 1981
Primary view of 10-joule high-voltage trigger micro Marx
Platts, D. A.
January 1, 1981
Primary view of 10-kA pulsed power supply for superconducting coils
Ehsani, M.; Fuja, R. E. & Kustom, R. L.
January 1, 1981
Primary view of 10-MWe solar-thermal central-receiver pilot plant, solar facilities design integration: collector-field optimization report (RADL item 2-25)
unknown creator
January 1, 1981
Primary view of 15 Mile Road/Edison Corridor Sewer Tunnel Failure Study, Detroit Area, Michigan
Albert, Dick; Hoff, George C.; Lorence, Brian; Mitchell, Gerald B.; Mlakar, Paul F.; Murphy, William L. et al.
January 1981
Primary view of 20-kW Solar Photovoltaic Flat-Panel Power System for an Uninterruptible Power-System Load in El Paso, Texas. Phase Ii. System Fabrication. Final Report October 1, 1979-May 31, 1981
Risser, V.V.
December 1, 1981
Primary view of 28-nm laser damage testing of LIF
Foltyn, S. R. & Newman, B. E.
January 1, 1981
Primary view of 30-kV Proton Injector for PIGMI
Hamm, R. W.; Mueller, D. W. & Sturgess, R. G.
January 1, 1981
Primary view of 30-MJ superconducting magnetic energy storage for BPA transmission-line stabilizer
Schermer, R.I.
January 1, 1981
Primary view of 30-MJ superconducting magnetic-energy storage for BPA transmission-line stabilizer
Schermer, R. I.
January 1, 1981
Primary view of 30-MJ superconducting magnetic energy storage for electric-transmission stabilization
Turner, R. D. & Rogers, J. D.
January 1, 1981
Primary view of 100-kV, 2-ns risetime, dc-coupled probe
Power, J.; Nunnally, W. & Young, D.
January 1, 1981
Primary view of 200 Steamflood Demonstration Project. Fourth annual report, June 1979-June 1980
Alford, W O
February 1, 1981
Primary view of 300-MHz optical discriminator-counter
Turko, B. & Lo, C.C.
July 1, 1981
Primary view of 360/sup 0/ digital phase detector with 100-kHz bandwidth
Reid, D.W.; Riggin, D.; Fazio, M.V.; Biddle, R.S.; Patton, R.D. & Jackson, H.A.
January 1, 1981
Primary view of 500-kW DCHX pilot-plant evaluation testing
Hlinak, A.; Lee, T.; Loback, J.; Nichols, K.; Olander, R.; Oshmyansky, S. et al.
October 1, 1981
Primary view of 870. 8-keV gamma ray from PuOâ‚‚
Hsu, H.H.
January 1, 1981
Primary view of 1170-MW(t) HTGR-PS/C plant application-study report: alumina-plant application
Rao, R.; McMain, A. T., Jr. & Stanley, J. D.
May 1981
Primary view of 1170-MW(t) HTGR-PS/C plant application study report: Geismar, Louisiana refinery/chemical complex application
McMain, Jr., A. T. & Stanley, J. D.
May 1, 1981
Primary view of 1170-MW(t) HTGR-PS/C plant application study report: shale oil recovery application
Rao, R. & McMain, A.T. Jr.
May 1, 1981
Back to Top of Screen