Technical Report Archive & Image Library (TRAIL) - 32,785 Matching Results

Search Results

Primary view of 100-Ton Test : Measurement of the Velocity of Sound
Barschall, H. H. & Martin, G.
June 15, 1945
Primary view of 200-Mwe Prototype Large SGR: Reactor Structure Design and Evaluation
North American Aviation. Atomics International Division.
1965
Primary view of 300,000-KWE SGR Nuclear Power Plant of Current Technology
Renard, J.; Peckinpaugh, C. L. & Aronstein, R. E.
August 1, 1960
Primary view of 300-400 V Regulated Supply
U.S. Atomic Energy Commission
1946?
Primary view of The 300 H.P. Benz Aircraft Engine
Heller, A.
January 1921
Primary view of 300-KV Pulser Transformer and Pulser.
Heller, R. E.
November 1951
Primary view of 300 Mc Transmitter Pulser
Titterton, E. W.
1947
Primary view of 327 Basin Aluminum Corrosion Test
Mallett, G. R.
February 9, 1956
Primary view of 568 Report
Pollard, Ernest C. (Ernest Charles), 1906-1997
1960
Primary view of 709 Program for Reduction of Exponential Pile Data
Matsumoto, D. D.
August 20, 1959
Primary view of The 1000 HP Traffic Airplane of the Zeppelin Works in Staaken
Rohrbach, A. K.
September 1921
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 1
General Electric Company
February 14, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 2
General Electric Company
February 14, 1964
Primary view of 1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 3
General Electric Company
February 14, 1964
Primary view of 1000-MWe LMFBR Follow-On Study, Task I Report: Volume 1
Goulding, B. J.
June 1967
Primary view of 1000-MWe LMFBR Follow-On Study, Task I Report: Volume 2, Concept I System Description
Boyer, R. L.
April 1967
Primary view of 1000-MWe LMFBR Follow-On Study, Task I Report: Volume 3, Concept II System Description
Goulding, B. J.
June 1967
Primary view of 1000-MWe LMFBR Follow-On Study, Task I Report: Volume 4, Concept III System Description
Goulding, B. J.
July 1967
Primary view of 1000-MWe LMFBR Follow-On Study, Task I Report: Volume 5, Concept IV System Description
Goulding, B. J.
August 1967
Primary view of 1024 Channel Time-of-Flight Analyzer for MTR Fast Chopper - Operating Manual
Petree, F. L.
March 11, 1959
Primary view of The 1350 F stress-rupture properties of two wrought alloys and three cast alloys
Reynolds, E. E.; Freeman, J. W. & White, A. E.
November 1947
Primary view of 1500 Uses Delay Unit
Titterton, E. W.
1945
Primary view of A 1620 FORTRAN Programme for the Calculation of Bragg Angles for use in Powder X-Ray Diffraction Investigations
Walker, D. G.
April 1963
Primary view of A 1620 FORTRAN Programme for the Refinement of Lattice Parameters by a Modified Least Squares Method
Walker, D. G.
April 1963
Back to Top of Screen