You limited your search to:

 Collection: Technical Report Archive and Image Library
1000-MWe LMFBR Follow-On Study, Task I Report: Volume 5, Concept IV System Description

1000-MWe LMFBR Follow-On Study, Task I Report: Volume 5, Concept IV System Description

Date: August 1967
Creator: Goulding, B. J.
Description: From introduction: "The last of four designs to be developed by Babcock & Wilcox (B&W), Concept IV observes ground rules established under the LMFBR Follow-On Program and is based on the estimated state of technology in 1980."
Contributing Partner: UNT Libraries Government Documents Department
The 1350 F stress-rupture properties of two wrought alloys and three cast alloys

The 1350 F stress-rupture properties of two wrought alloys and three cast alloys

Date: November 1, 1947
Creator: Reynolds, E E; Freeman, J W & White, A E
Description: None
Contributing Partner: UNT Libraries Government Documents Department
The 1926 German seaplane contest

The 1926 German seaplane contest

Date: March 1, 1928
Creator: Seewald, F; Blenk, H & Liebers, F
Description: The report discusses the problem of rating the various seaplane designs from the 1926 seaplane contest. The whole process of rating consists in measuring the climbing speed, flying weight and carrying capacity of a seaplane and then using these data as the basis of a construction problem.
Contributing Partner: UNT Libraries Government Documents Department
The 1929 Rhon soaring-flight contest

The 1929 Rhon soaring-flight contest

Date: April 1, 1930
Creator: Lippisch, Alexander
Description: The limitation of the 1929 contest to performance gliders necessitated the establishment of a formula which would make it possible to distinguish between performance gliders and school and training gliders. The sinking speed was therefore adopted as the basis for such a distinction, and the requirement was made that the sinking speed of a performance glider should not exceed 0.8 m/s. The rest of the report details the different entries with regard to design and performance.
Contributing Partner: UNT Libraries Government Documents Department
The 1933 contest for the Deutsch de la Meurthe trophy

The 1933 contest for the Deutsch de la Meurthe trophy

Date: October 1, 1933
Creator: Leglise, Pierre; Hirschauer, L & Saladin, Raymond
Description: None
Contributing Partner: UNT Libraries Government Documents Department
The 1934 contest for the Deutsch de la Meurthe trophy

The 1934 contest for the Deutsch de la Meurthe trophy

Date: February 1, 1935
Creator: Leglise, Pierre
Description: This report presents a description of the rules, history and new technical innovations in the Deutsch de la Meurthe Cup race of 1934.
Contributing Partner: UNT Libraries Government Documents Department
The 1958 He4 Scale of Temperatures: Part 1. Introduction, Part 2. Tables for the 1958 Temperature Scale

The 1958 He4 Scale of Temperatures: Part 1. Introduction, Part 2. Tables for the 1958 Temperature Scale

Date: June 17, 1960
Creator: Brickwedde, F. G. (Ferdinand Graft), 1903-; van Dijk, H.; Durieux, M.; Clement, J. R. & Logan, J. K.
Description: Report containing information regarding He4 vapor pressure measurement as of 1958, the recent history of the vapor pressure temperature scale, and a series of tables containing these measurements.
Contributing Partner: UNT Libraries Government Documents Department
1985 Annual Site Environmental Report for Argonne National Laboratory

1985 Annual Site Environmental Report for Argonne National Laboratory

Date: March 1986
Creator: Golchert, N. W.; Duffy, T. L. & Sedlet, J.
Description: Report on the environmental impact of Argonne National Laboratory.
Contributing Partner: UNT Libraries Government Documents Department
1986 Annual Site Environmental Report for Argonne National Laboratory

1986 Annual Site Environmental Report for Argonne National Laboratory

Date: March 1987
Creator: Argonne National Laboratory
Description: Report on the ongoing environmental monitoring program at Argonne National Laboratory.
Contributing Partner: UNT Libraries Government Documents Department
²³⁵U(n,f), ²³⁸U(n, gamma), ²³⁸U(n,f), ²³⁹Pu(n,f) Reaction Rate Measurement Calibrations at ZPPR

²³⁵U(n,f), ²³⁸U(n, gamma), ²³⁸U(n,f), ²³⁹Pu(n,f) Reaction Rate Measurement Calibrations at ZPPR

Date: January 1987
Creator: Poenitz, W. P.; Maddison, D. W.; Gasidlo, J. M.; Carpenter, S.G. & Armani, R. J.
Description: New reference deposits for uranium-235, plutonium-239 and uranium-238 have been established with mass uncertainties of <0.2%. These new deposits replace the older reference deposits which were used during the last 17 years and improve the uncertainty of reaction rate measurements due to reference mass uncertainties by about a factor of 6. Measurements of the fission fragment absorption in 2 pi and low-geometry count rates. Two measurements of the uranium-238 capture rate in depleted uranium samples based upon the thermal cross sections of uranium-238(n, gamma), uranium-235(n,f) and plutonium-239(n,f) and based upon the americium-243 calibration technique confirm the ZPPR measurement technique within the quoted uncertainty of +/-0.5%
Contributing Partner: UNT Libraries Government Documents Department