PM-1 Nuclear Power Plant Program: 3rd Quarterly Progress Report, September 1, 1959-November 30, 1959

Description: From abstract: The principal efforts are the furthering of the final design and preparation of specifications for some long-lead components. The entire power plant has been divided, for final design purposes, into 37 subsystems. The status of work on each subsystem at the close of the period is reported.
Date: March 1960
Creator: Martin Company. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: 4th Quarterly Progress Report, December 1, 1959-February 29, 1960

Description: From abstract: The principal efforts during the fourth project quarter were the near-completion of the final design and preparation of specifications for plant components. Reactor development work included final preparations for the flexible zero-power test (PMZ-1) program and revised fuel element irradiation test program, continuation of reactor flow test, further work on heat transfer test program, and final design and fabrication of the prototype magnetic jack-type control rod actuators.
Date: April 5, 1960
Creator: Martin Company. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

PM-1 Nuclear Power Plant Program: 5th Quarterly Progress Report, March 1, 1960-May 31, 1960

Description: From abstract: Reactor development work includes: initiation of the flexible zero-power test (PMZ-1) experimental program, fabrication and delivery of a PM-1 type fuel element, continuation of reactor flow and heat transfer tests, development work on rare earth control rods, and testing and redesign of the prototype magnetic jack-type control rod actuator.
Date: July 5, 1960
Creator: Martin Company. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

Swaged Metal Fiber-UO₂ Fuel Element: Final Report

Description: From introduction: The objectives of this program were to: study the variables of uranium dioxide, metal fibers and cladding material and determine the effects of swaging, develop thermal conductivity tests for small diameter rod-type elements, determine the thermal conductivity of various combinations of metal fibers and uranium dioxide, and select optimum combinations of the above variables to recommend for irradiation testing.
Date: January 1960
Creator: Kane, John
Partner: UNT Libraries Government Documents Department
open access

Strontium 90 Power Project: Final Summary Report

Description: From summary: The primary purpose of this project is to determine the feasibility of converting reactor waste Strontium-90 into a safe and useful source of electrical energy. Secondary purpose is physical and environmental testing of the power conversion device or thermoelectric couples. This required actual fabrication of a 100-thermal-watt strontium titanate fuel element
Date: March 1960
Partner: UNT Libraries Government Documents Department
open access

Final Safety Analysis Report: SNAP III Thermoelectric Generator

Description: From summary: An analysis has been performed to determine the ability of the fuel container to withstand the various thermal, mechanical and chemical forces imposed upon the generator by vehicle failures. Where theoretical analysis was impossible, and where experimental evidence was desired, capsules and generators were tested under simulated missile-failure conditions. Thus, the safety limits of SNAP III in a satellite application were defined.
Date: June 1960
Creator: Hagis, W. & Dix, George P.
Partner: UNT Libraries Government Documents Department