Search Results

open access

In-Pile Test of Prototype ML-1 Fuel Elements

Description: Report documenting the testing of prototype fuel elements used in a mobile nuclear power plant. Includes descriptions and evaluations of the test.
Date: June 1964
Creator: Brunhouse, J. S.; Burgess, A. B.; Geering, G. T.; Nakazato, S. & Titus, G. W.
Partner: UNT Libraries Government Documents Department
open access

ABWR: PL-2 Design Report

Description: From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
Date: October 15, 1960
Creator: Combustion Engineering, inc. Nuclear Division.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen