Search Results

15 Mile Road/Edison Corridor Sewer Tunnel Failure Study, Detroit Area, Michigan
Partial abstract: "The study consisted of field and laboratory investigations, construction evaluation, and geotechnical and structural analyses to determine the cause(s) of distress and failure of a 2600-ft section of 12-ft 9-in. diameter concrete-lined sanitary sewer tunnel in the Detroit, Mich., area. [...] The report includes summaries of all pertinent construction records, results of all pertinent past and current field and laboratory tests on construction and geotechnical materials, and detailed geotechnical and structural analyses based on observed conditions and measured parameters."
Extrusion at Revere Copper and Brass Inc., March 1, 1949
The following report discusses the process of several sections of beryllium where 3.018" squares 40" in length can be machined, and six sound 8.0" diameter billets and three trial billets containing casting defects can be extruded.
Gas Masks for Gases Met in Fighting Fires
Technical paper issued by the Bureau of Mines over the development of gas masks designed for fighting fires. The characteristics of the different types of masks in development are presented. This paper includes tables, illustrations, and photographs.
Back to Top of Screen