Report issued by the Brookhaven National Laboratory discussing annual work conducted during 1961. As stated in the introduction, "the progress and trends of the research program are presented together with a description of the operational, service, and administrative activities of the Laboratory" (p. ix). This report includes tables, illustrations, and photographs.
Report that reviews the yearly progress made in Reactor Fuel and Materials Development Program at the Engineering Test Reactor (ETR) and Materials testing reactor (MTR).
The Stationary Low Power Reactor No. 1 (SL-1) was a boiling water reactor demonstration plant for remote military bases. The plant had been operated by Combustion Engineering, Inc. from February, l959 until January 3, 1961 at which time a nuclear excursion rendered the plant inoperable, This report summarizes the of operations of maintenance, test, health and safety, and administrative activities for the year February, 1960 until the incident.
This dialog allows you to filter your current search.
Each of the Serial/Series Titles listed note their name and the number of records that will be limited down to if you choose that option.
The list can be sorted by name or the count.
This dialog allows you to filter your current search.
Each of the Years listed note their name and the number of records that will be limited down to if you choose that option.
This dialog allows you to filter your current search.
Each of the Months listed note their name and the number of records that will be limited down to if you choose that option.
This dialog allows you to filter your current search.
Each of the Days listed note their name and the number of records that will be limited down to if you choose that option.