Search Results

open access

ABWR: PL-2 Design Report

Description: From preface: This report satisfies the quarterly progress report requirements for PL-1 and PL-2 plant design work for the period ending September 30, 1960 At present time a SL-1 Core 2 is under construction. This is a replacement core for SL-1 (ALPR) and will be identical to a PL-2 core; a PL condenser is under test at the SL-1 facility; final construction plans for PL components and modules which are not site sensitive will be completed in March 1961.
Date: October 15, 1960
Creator: Combustion Engineering, inc. Nuclear Division.
Partner: UNT Libraries Government Documents Department
open access

Army Gas-Cooled Reactor Systems Program Monthly Progress Report: April 1959

Description: Abstract: This monthly progress report covers the activities of the Army Gas-Cooled Reactor System Program for April 1959. The program includes a water-moderated heterogeneous reactor (Gas-Cooled Reactor Experiment I), a graphite-moderated homogeneous reactor (Gas-Cooled Reactor Experiment II), a mobile gas-cooled reactor (ML-1), and the coordination of the Gas Turbine Test Facility. [It reports] the progress of each project, the associated tests and data evaluation, the applicable design crit… more
Date: May 25, 1959
Creator: Aerojet-General Corporation
Partner: UNT Libraries Government Documents Department
open access

In-Pile Test of Prototype ML-1 Fuel Elements

Description: Report documenting the testing of prototype fuel elements used in a mobile nuclear power plant. Includes descriptions and evaluations of the test.
Date: June 1964
Creator: Brunhouse, J. S.; Burgess, A. B.; Geering, G. T.; Nakazato, S. & Titus, G. W.
Partner: UNT Libraries Government Documents Department
open access

Preliminary Design 30,000 KW Prototype Partially Enriched Uranium, Gas Cooled, Graphite Moderated Nuclear Power Plant (Prototype of an Optimum Plant) for United States Atomic Energy Commission, Idaho Operations Office contract no. AT(10-1)-925

Description: Report containing the preliminary design for a nuclear reactor plant and its facilities. Includes a description of systems, safety procedures, costs, and a glossary.
Date: March 1959
Creator: Kaiser Engineers
Partner: UNT Libraries Government Documents Department
Back to Top of Screen