2-Fold G.M. Coincidence Unit
Report containing a diagram of a coincidence unit, outlining resistor values and other technical specifications. digital.library.unt.edu/ark:/67531/metadc100860/
4-Channel Line Driver: Modified
Technical drawing of line drivers and amplifiers for use in nuclear reactors. digital.library.unt.edu/ark:/67531/metadc100891/
The 5- by 7-meter wind tunnel of the DVL
The report contains a description of the DVL wind tunnel. According to the cones fixed, an elliptical stream with axes 5 by 7 meters and length 9 meters, or a stream 6 by 8 meters in cross section and 11 meters in length is available. The top speed with the smaller cone is 65 meters per second. The testing equipment consists of an automatic six-component balance and a test rig for propellers and engines up to 650 horsepower. digital.library.unt.edu/ark:/67531/metadc63426/
The 6-foot-4-inch wind tunnel at the Washington Navy Yard
The 6-foot-4-inch wind tunnel and its auxiliary equipment has proven itself capable of continuous and reliable output of data. The real value of the tunnel will increase as experience is gained in checking the observed tunnel performance against full-scale performance. Such has been the case of the 8- by 8-foot tunnel, and for that reason the comparison in the calibration tests have been presented. digital.library.unt.edu/ark:/67531/metadc54183/
The 7 by 10 foot wind tunnel of the National Advisory Committee for Aeronautics
This report presents a description of the 7 by 10 foot wind tunnel and associated apparatus of the National Advisory Committee for Aeronautics. Included also are calibration test results and characteristic test data of both static force tests and autorotation tests made in the tunnel. digital.library.unt.edu/ark:/67531/metadc66069/
7-GeV Advanced Photon Source Beamline Initiative. Conceptual Design Report
The DOE is building a new generation 6-7 GeV Synchrotron Radiation Source known as the Advanced Photon Source (APS) at Argonne National Laboratory. This facility, to be completed in FY 1996, can provide 70 x-ray sources of unprecedented brightness to meet the research needs of virtually all scientific disciplines and numerous technologies. The technological research capability of the APS in the areas of energy, communications and health will enable a new partnership between the DOE and US industry. Current funding for the APS will complete the current phase of construction so that scientists can begin their applications in FY 1996. Comprehensive utilization of the unique properties of APS beams will enable cutting-edge research not currently possible. It is now appropriate to plan to construct additional radiation sources and beamline standard components to meet the excess demands of the APS users. In this APS Beamline Initiative, 2.5-m-long insertion-device x-ray sources will be built on four straight sections of the APS storage ring, and an additional four bending-magnet sources will also be put in use. The front ends for these eight x-ray sources will be built to contain and safeguard access to these bright x-ray beams. In addition, funds will be provided to build standard beamline components to meet scientific and technological research demands of the Collaborative Access Teams. The Conceptual Design Report (CDR) for the APS Beamline Initiative describes the scope of all the above technical and conventional construction and provides a detailed cost and schedule for these activities. The document also describes the preconstruction R & D plans for the Beamline Initiative activities and provides the cost estimates for the required R & D. digital.library.unt.edu/ark:/67531/metadc283143/
7-GeV Advanced Photon Source : Conceptual Design Report
During the past decade, synchrotron radiation emitted by circulating electron beams has come into wide use as a powerful, versatile source of x-rays for probing the structure of matter and for studying various physical processes. Several synchrotron radiation facilities with different designs and characteristics are now in regular operation throughout the world, with recent additions in this country being the 0.8-GeV and 2.5-GeV rings of NSLS at Brookhaven National Laboratory. However, none of the operating facilities has been designed to use a low-emittance, high-energy stored beam, together with modern undulator devices, to produce a large number of hard x-ray beams of extremely high brilliance. This document is a proposal to the Department of Energy to construct and operate high-energy synchrotron radiation facility at Argonne National Laboratory. We have now chosen to set the design energy of this facility at 7.0 GeV, with the capability to operate at up to 7.5 GeV. digital.library.unt.edu/ark:/67531/metadc282823/
7-GeV Advanced Photon Source Instrumentation Initiative. Conceptual Design Report
In this APS Instrumentation Initiative, 2.5-m-long and 5-m-long insertion-device x-ray sources will be built on 9 straight sections of the APS storage ring, and an additional 9 bending-magnet sources will also be put in use. The front ends for these 18 x-ray sources will be built to contain and safeguard access to these bright x-ray beams. In addition, funds will be provided to build state-of-the-art insertion-device beamlines to meet scientific and technological research demands well into the next century. This new initiative will also include four user laboratory modules and a special laboratory designed to meet the x-ray imaging research needs of the users. The Conceptual Design Report (CDR) for the APS Instrumentation Initiative describes the scope of all the above technical and conventional construction and provides a detailed cost and schedule for these activities. According to these plans, this new initiative begins in FY 1994 and ends in FY 1998. The document also describes the preconstruction R & D plans for the Instrumentation Initiative activities and provides the cost estimates for the required R & D. digital.library.unt.edu/ark:/67531/metadc283119/
An 8-foot axisymmetrical fixed nozzle for subsonic Mach numbers up to 0.99 and for a supersonic Mach number of 1.2
No Description digital.library.unt.edu/ark:/67531/metadc58368/
8 Inch Vacuum Pump
Technical drawings of vacuum pumps and machinery for use in nuclear reactors. digital.library.unt.edu/ark:/67531/metadc100918/
10 M.C. Wide Band Amplefier and Scope
Technical drawing of an amplifier for a nuclear reactor. digital.library.unt.edu/ark:/67531/metadc100864/
10 MWe Sodium Deuterium Reactor Design Report
From foreword: This report describes the goal of the overall SDR program to demonstrate the commercial generation of electrical power using a sodium-cooled reactor. digital.library.unt.edu/ark:/67531/metadc502675/
11,400 KW Nuclear Power Plant Employing an Organic Moderated Reactor: Preliminary Description
Abstract: The preliminary design is described for a small electric-power-generating plant powered by an organic moderated reactor. System and component requirements are discussed and possible design configurations and equipment are described. digital.library.unt.edu/ark:/67531/metadc853023/
15 Mile Road/Edison Corridor Sewer Tunnel Failure Study, Detroit Area, Michigan
Partial abstract: "The study consisted of field and laboratory investigations, construction evaluation, and geotechnical and structural analyses to determine the cause(s) of distress and failure of a 2600-ft section of 12-ft 9-in. diameter concrete-lined sanitary sewer tunnel in the Detroit, Mich., area. [...] The report includes summaries of all pertinent construction records, results of all pertinent past and current field and laboratory tests on construction and geotechnical materials, and detailed geotechnical and structural analyses based on observed conditions and measured parameters." digital.library.unt.edu/ark:/67531/metadc303923/
15 MW Gas-Cooled Closed-Cycle Reactor Power System Study: Final Report, Volumes 1-2
This report covers a feasibility study for a 15 megawatt gas cooled reactor power system, conducted by the Ford Instrument Company Division of the Sperry Rand Corporation during the months of March to August 1956. digital.library.unt.edu/ark:/67531/metadc304105/
20,000 KW Nuclear Power Plant Study for United States Atomic Energy Commission
Introduction: In September of 156, Gilbert Associates, Inc., entered into a contract with the United States of America, acting through the United States Atomic Energy Commission, for the study and preliminary design of a nuclear power plant being considered for integration into a central station power system at an overseas site. digital.library.unt.edu/ark:/67531/metadc783725/
20-ton and 1/2-ton High Explosive Cratering Experiments in Basalt Rock: Final Report, August 1962
From preface: Project Buckboard, a Plowshare sponsored effort, involved the detonation of three 40,000-pound and ten 1000-pound high-explosive charges in basalt rock. digital.library.unt.edu/ark:/67531/metadc304206/
20-ton HE Cratering Experiments in Desert Alluvium: Final Report, May 1962
From abstract and summary: Project Stagecoach consisted of the detonation of three 40,000-pound charges. Blocks of cast TNT were stacked to resemble a sphere and, the whole center-detonated. digital.library.unt.edu/ark:/67531/metadc304201/
30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System
Final design for the 30 megawatt intermediate heat exchanger and steam generator. digital.library.unt.edu/ark:/67531/metadc100973/
30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 2, Chemical and Stress Analysis
Chemical engineering analysis and stress analysis for design of the 3 megawatt intermediate heat exchanger and steam generator for service with a liquid sodium heat transfer fluid. digital.library.unt.edu/ark:/67531/metadc100974/
30 Megawatt Heat Exchanger and Steam Generator for Sodium Cooled Reactor System: Volume 4, Operation and Maintenance Procedures
Operation and maintenance procedures for 30 megawatt heat exchanger and steam generator for sodium cooled reactor system. digital.library.unt.edu/ark:/67531/metadc100975/
30 Rv. Power Supply
Technical drawing of electronic circuits and power supplies to nuclear reactors. digital.library.unt.edu/ark:/67531/metadc100883/
100-Ton Test at Trinity: Report on Earth Velocity Measurements
Apparatus, field layout, miscellaneous testing, and the method of analysis of a 100-ton test at Trinity. digital.library.unt.edu/ark:/67531/metadc100797/
200-Mwe Prototype Large SGR: Reactor Structure Design and Evaluation
From abstract: This document presents the reactor structure design and evaluation for a 200-Mwe prototype large SGR. digital.library.unt.edu/ark:/67531/metadc860802/
300,000-KWE SGR Nuclear Power Plant of Current Technology
Abstract: This report describes a 300,000-kwe, sodium-cooled, graphite-moderated nuclear power plant based on existing technical information. digital.library.unt.edu/ark:/67531/metadc853112/
300-400 V Regulated Supply
1 technical drawing of a regulated supply of 300-400 volts for nuclear reactors. digital.library.unt.edu/ark:/67531/metadc100863/
The 300 H.P. Benz Aircraft Engine
This report provides a description of the Benz 300 H.P. aircraft engine containing 12 cylinders placed at a 60° angle. It includes a detailed description of the development of the constructional points, particularly the cylinders, pistons, and connecting rods, as well as the engine fitting, lubrication, oil pumps, bearings, oil tank, fuel pump, carburetors, and cooling system. There are seven pages of illustrative figures at the end of the report. digital.library.unt.edu/ark:/67531/metadc53726/
300 Mc Transmitter Pulser
Technical drawing of pulse generators for use in nuclear reactors. digital.library.unt.edu/ark:/67531/metadc100878/
The 1000 HP traffic airplane of the Zeppelin Works in Staaken
No Description digital.library.unt.edu/ark:/67531/metadc53613/
1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 1
From introduction: "Summary report of the 1000 MWe Boiling Water Reactor Plant Feasibility Study performed by the General Electric Company." digital.library.unt.edu/ark:/67531/metadc101092/
1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 2
From introduction: "Presents the detailed description of a 1000 MW Electric Power Plant employing one or two Boiling Water Reactors as the steam source." digital.library.unt.edu/ark:/67531/metadc101093/
1000 MegaWatt Boiling Water Reactor Plant Feasibility Study: Volume 3
From introduction: "Contains the appendices and a complete set of drawings related to the 1000 MWe Boiling Water Reactor Plant Feasibility Study performed by the General Electric Company for the United States Atomic Energy Commission." digital.library.unt.edu/ark:/67531/metadc101094/
1000-MWe LMFBR Follow-On Study, Task I Report: Volume 1
From introduction: "The objective of this study is to provide information that will assist the Atomic Energy Commission in furthering the National Liquid Metal Fast Breeder Reactor (LMFBR) Program. We plan to accomplish this end, in part, by extending the original studies to include system and component design and parametric evaluations of the nuclear steam supply system and its related systems and subsystems based on a n estimation of the state of technology in 1980." digital.library.unt.edu/ark:/67531/metadc101110/
1000-MWe LMFBR Follow-On Study, Task I Report: Volume 2, Concept I System Description
From introduction: "This report has been prepared in conjunction with the Liquid Metal Fast Breeder Reactor (LMFBR) Follow-On Study. It is the Concept I description of Task I as outlined by Argonne National Laboratory (ANL) in Appendix C of their Follow-On Study Program." digital.library.unt.edu/ark:/67531/metadc101111/
1000-MWe LMFBR Follow-On Study, Task I Report: Volume 3, Concept IV System Description
From introduction: "This report has been prepared in conjunction with the Liquid Metal Fast Breeder Reactor (LMFBR) Follow-On Study. It is the Concept II description of Task I as outlined by Argonne National Laboratory (ANL) in Appendix C of their Follow-On-Study Program." digital.library.unt.edu/ark:/67531/metadc101112/
1000-MWe LMFBR Follow-On Study, Task I Report: Volume 4, Concept III System Description
From introduction: "The third of four designs to be developed by Babcock & Wilcox (B&W), Concept III observes ground rules established under the LMFBR Follow-On Program and is based on the estimated state of technology in 1980." digital.library.unt.edu/ark:/67531/metadc101113/
1000-MWe LMFBR Follow-On Study, Task I Report: Volume 5, Concept IV System Description
From introduction: "The last of four designs to be developed by Babcock & Wilcox (B&W), Concept IV observes ground rules established under the LMFBR Follow-On Program and is based on the estimated state of technology in 1980." digital.library.unt.edu/ark:/67531/metadc101114/
1024 Channel Time-of-Flight Analyzer for MTR Fast Chopper - Operating Manual
Report on the principle of measuring the time-of-flight of neutrons, magnetic-core storage of detector pulses, how pulses are stored, current generator, storage cycle generator, and cathode ray oscillograph. digital.library.unt.edu/ark:/67531/metadc67282/
The 1350 F stress-rupture properties of two wrought alloys and three cast alloys
No Description digital.library.unt.edu/ark:/67531/metadc55436/
1500 Uses Delay Unit
Technical drawing of signal generators in nuclear reactors. digital.library.unt.edu/ark:/67531/metadc100890/
The 1926 German seaplane contest
The report discusses the problem of rating the various seaplane designs from the 1926 seaplane contest. The whole process of rating consists in measuring the climbing speed, flying weight and carrying capacity of a seaplane and then using these data as the basis of a construction problem. digital.library.unt.edu/ark:/67531/metadc65292/
The 1929 Rhon soaring-flight contest
The limitation of the 1929 contest to performance gliders necessitated the establishment of a formula which would make it possible to distinguish between performance gliders and school and training gliders. The sinking speed was therefore adopted as the basis for such a distinction, and the requirement was made that the sinking speed of a performance glider should not exceed 0.8 m/s. The rest of the report details the different entries with regard to design and performance. digital.library.unt.edu/ark:/67531/metadc277555/
The 1933 contest for the Deutsch de la Meurthe trophy
No Description digital.library.unt.edu/ark:/67531/metadc63516/
The 1934 contest for the Deutsch de la Meurthe trophy
This report presents a description of the rules, history and new technical innovations in the Deutsch de la Meurthe Cup race of 1934. digital.library.unt.edu/ark:/67531/metadc63460/
The 1958 He4 Scale of Temperatures: Part 1. Introduction, Part 2. Tables for the 1958 Temperature Scale
Report containing information regarding He4 vapor pressure measurement as of 1958, the recent history of the vapor pressure temperature scale, and a series of tables containing these measurements. digital.library.unt.edu/ark:/67531/metadc13148/
1985 Annual Site Environmental Report for Argonne National Laboratory
Report on the environmental impact of Argonne National Laboratory. digital.library.unt.edu/ark:/67531/metadc282784/
1986 Annual Site Environmental Report for Argonne National Laboratory
Report on the ongoing environmental monitoring program at Argonne National Laboratory. digital.library.unt.edu/ark:/67531/metadc282817/
²³⁵U(n,f), ²³⁸U(n, gamma), ²³⁸U(n,f), ²³⁹Pu(n,f) Reaction Rate Measurement Calibrations at ZPPR
New reference deposits for uranium-235, plutonium-239 and uranium-238 have been established with mass uncertainties of <0.2%. These new deposits replace the older reference deposits which were used during the last 17 years and improve the uncertainty of reaction rate measurements due to reference mass uncertainties by about a factor of 6. Measurements of the fission fragment absorption in 2 pi and low-geometry count rates. Two measurements of the uranium-238 capture rate in depleted uranium samples based upon the thermal cross sections of uranium-238(n, gamma), uranium-235(n,f) and plutonium-239(n,f) and based upon the americium-243 calibration technique confirm the ZPPR measurement technique within the quoted uncertainty of +/-0.5% digital.library.unt.edu/ark:/67531/metadc282813/
6144-Channel Time-of-Flight Analyzer
Report describing a 6144-channel analyzer designed and built for the purpose of analyzing time-of-flight during studies of slow neutron scattering at Hanford Laboratories. This includes descriptions of the analyzer, its logic and circuits, and its test mode. digital.library.unt.edu/ark:/67531/metadc100653/
630A Maritime Nuclear Steam Generator Scoping Study
From foreword: This report presents the results of a study of a nuclear steam generator which uses reactor technology during the aircraft nuclear propulsion program to produce superheated steam for marine propulsion. digital.library.unt.edu/ark:/67531/metadc304088/