Search Results

Army Gas-Cooled Reactor Systems Program Semiannual Progress Report: July 1 - December 31, 1959
Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: July 1 - September 30, 1963
Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1963
Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Army Gas-Cooled Reactor Systems Program Quarterly Progress Report: October 1 - December 31, 1964
Report documenting the progress of the Army Gas-Cooled Reactor Systems Program to develop a mobile nuclear power plant for military field operation.
Automatic Mass Spectrometer for Isotopic Analysis of Lithium
Report discussing an improvement program on lithium mass spectrometers.
Critical Mass Studies of Plutonium Solutions
Chain reacting conditions for plutonium nitrate in water solution have been examined experimentally for a variety of sizes of spheres and cylinders.
In-Pile Loop Corrosion Experiments with Uranyl Sulfate Solutions at 235 and 250 C
Report presenting in-pile loop experiments DD, EE, FF, GG, L-412, L-413, and L-418, which were seven of a series designed to test the radiation corrosion of zirconium, titanium, and stainless steel alloys in solutions under various conditions of radiation intensity, temperature, solution composition, and velocity of flow. Steel specimens exposed in the loop cores showed increases in corrosive attack over that expected out-of-radiation.
Metallurgy Research Operation: Quarterly Progress Report, January - March 1965
Quarterly progress report on a project to test the radiation effects on metallurgy.
Plutonium Recycle Test Reactor Final Safeguard Analysis: Supplement 2, Consequences of a Primary Coolant Leak
Review of previous work is presented in addition to the results of recent studies concerning loss of primary coolant when the system is cold and pressurized and the problem of supplying adequate cooling following the injection of light water.
Quarterly Progress Report Research and Development Activities Fixation of Radioactive Residues: October - December, 1964
Report presenting research and development activities in the field of radioactive wastes. This particular report is concerned with the fixation of radioactive residues when the failure of a pot liner destroyed the furnace.
Radiolysis of Organic Fluids, Annual Progress Report: October 1, 1961-September 30, 1962
From introduction: This report reviews the Susie program (particularly reactor dosimetry and data analysis) as well as other items that represent a smaller share of the total effort.
Research and Development Activities in the Radiological Sciences, Physical Sciences Portion, January - December 1961
Report regarding ongoing research and development undertaken at Hanfdord Laboratories' physics and instruments laboratory and chemical laboratory.
Specifications for Swaged UO2 19-Rod Cluster, PRTR Fuel Element Mark 1
Specifications including detail dimension, materials, fabrication steps, acceptance criteria, and final assembly steps for the swaged uranium dioxide, 19-rod cluster Plutonium Recycle Test Reactor fuel element.
Ultrasonic Resin Level Detector
This report describes the development of an ultrasonic instrument for resin level measurements in an ion exchange column.
A Versatile Spectrometer Magnet Power Supply
Early results from actual laboratory operation of a more versatile magnet supply.
Back to Top of Screen