Condensate System. Section II. Fifth Core I, Seed 1. Test Results DL-S-105
Description:
The purpose of the test was to fill the condensate storage tank and the Condensate System and obtain satisfactory preliminary operation. The components of the Condensate System performed adequately and satisfactorily with the exception of fill control valve (M9-VI). This valve (M9-VI) is not used in the current operation procedure.
Date:
December 8, 1959
Item Type:
Refine your search to only
Report
Partner:
UNT Libraries Government Documents Department