Search Results

Fabrication of Zirconium Alloys For Specific Zirconium Alloy Design Program
The raw materials and fabrication procedures employed in preparing thirty two zirconium alloy compositions for evaluation as described in GEAP-3979 are reported. Considerations involved in the extension of reported laboratory procedures to larger scale production are discussed.
Program For the Development of Plutonium Recycle For Use in Light Water Moderated Reactors: Third Quarterly Report
This is a report of work completed during the period October 1, 1961, to December 31, 1961. The Program fuel element was completed and assembled. After extensive analysis, it was concluded that the fuel was satisfactory for use in the Program.
Operating Procedures and Emergency Plans for the Dresden Nuclear Power Station
The General Electric Company is designing and building a 180,000 kilowatt nuclear power plant for the Commonwealth Edison Company at a site 47 miles southwest of Chicago. The construction permit was issued on May 4, 1956 but is subject to submittal to the Commission of a final hazards summary report and a finding by the Commission that the final design provides reasonable assurances that the health and safety of the public will not be endangered by operation of the reactor in accordance with the specified procedures.
Steam Slip and Burnout in Bulk Boiling Systems
In concurrent flow of two phase mixtures there exists a velocity difference between the vapor and liquid phases. This difference in velocity is known as the slip velocity. The prediction of slip is the subject of Part I. In boiling systems there is some heat transfer rate at which nucleste boiling becomes unstable. At this point the separate bubbles coalesce forming an insulating vapor film on the heat transfer surface resulting in the destruction, or burnout, of the heater. The prediction of the conditions causing burnout is the subject of Part II.
Fuel Cycle Program Progress Report: Twelfth Quarter, April-June 1963
Quarterly progress report discussing activities related to the Vallecitos Boiling Water Reactor (VBWR) and related facilities
Fuel Cycle Program Progress Report: Eleventh Quarter, January-March 1963
Quarterly progress report discussing activities related to the Vallecitos Boiling Water Reactor (VBWR) and related facilities.
Back to Top of Screen