Search Results

open access

Army PWR Support and Development Program Six Months Summary Report : October 1, 1961 - March 31, 1962

Description: Abstract: Progress is reported on research and development tasks under the Program Plan for Engineering Support and Development of Army Pressurized Water Reactor Power Plants, Contract AT(30-1)-2639, during the six months' period October 1, 1061 to March 31, 1962.
Date: May 25, 1962
Creator: Dixon, M. H.
Partner: UNT Libraries Government Documents Department
open access

BWR Reference Design for PL-3

Description: Abstract: The natural circulation, direct cycle, boiling water reactor reference design presented in this technical report is the alternate to the preferred preliminary design developed under Phase I of the PL-3 contract. The report presents plant design criteria, summary of plant selection, plant description, reactor and primary system description, thermal and hydraulic analysis, nuclear analysis, control and instrumentation description, shielding description, auxiliary systems, power plant eq… more
Date: February 28, 1962
Creator: Humphries, G. E.
Partner: UNT Libraries Government Documents Department
open access

Comparative Cost Study of Processing Stainless Steel-Jacketed UO2 Fuel: Mechanical Shear-Leach vs Sulfex-Core Dissolution

Description: Comparison of the economics of mechanical shear-leach and Sulfex decladding-core dissolution head end treatments for processing typical tubular bundles of stainless steel-jacketed UO2 nuclear fuels.
Date: April 23, 1962
Creator: Adams, J. B.; Benis, A. M. & Watson, C. D.
Partner: UNT Libraries Government Documents Department
open access

Conceptual Design for 75 MWe Mixed Spectrum Superheating Reactor Power Plant

Description: "This report presents the conceptual design of a 75 MWe prototype Mixed Spectrum Superheater power plant. The scope of the work has emphasized primarily the design, performance, and cost information on the nuclear portion of the plant. The research and development programs required to insure plant feasibility are also present."--Intro.
Date: February 25, 1962
Creator: U.S. Atomic Energy Commission
Partner: UNT Libraries Government Documents Department
open access

The Development and Testing of UO2 Fuel Systems for Water Reactor Applications: Summary Report, July 1, 1961 - June 15, 1962

Description: From introduction: "The work described in this report represents the Joint United States - European Atomic Energy Community effort which is in keeping with the spirit of cooperation in contributing to the common good by the sharing of scientific and technical information and minimizing the duplication of effort by the limited pool of technical talent available in Western Europe and the United States."
Date: June 1962
Creator: Murtha, B. E. & Chernock, W. P.
Partner: UNT Libraries Government Documents Department
open access

Effects of Major Parameters on Cycle Efficiency and Cost for a Gas-Cooled Reactor Turbine Power Plant

Description: Cycle study performed on a closed loop Brayton cycle incorporating a gas-cooled nuclear reactor, regeneration, and compressor intercooling. The purpose of the study was to determine the effect of various cycle parameters on efficiency and cost.
Date: October 5, 1962
Creator: Miskell, R. V.
Partner: UNT Libraries Government Documents Department
open access

EOCR Control Rod and Driver Fuel Hydraulic Tests

Description: Report discussing the results of experiments on an EOCR prototype control rod, control rod drive, and driver fuel assembly that were extensively tested in 500 deg F Santowax and 132 deg F water. These tests not only established the operating characteristics of these assemblies but also revealed a number of deficiencies in the various components. It includes descriptions of the control rod, control rod drive, and driver fuel assembly together with descriptions of their method of operation.
Date: October 19, 1962
Creator: Harrison, L. J.
Partner: UNT Libraries Government Documents Department
open access

Experimental Studies of Transient Effects in Fast Reactor Fuels

Description: An experimental program to evaluate the performance of FCR and EFCR fuel during transient operation is outlined, and the initial series of tests are described in some detail. Test results from five experiments in the TREAT reactor, using 1-in. OD SS-clad UO₂ fuel specimens, are compared with regard to fuel temperatures, mechanical integrity, and post-irradiation appearance. Incipient fuel pin failure limits for transients are identified with maximum fuel temperatures in the range of 7000 deg F.… more
Date: November 15, 1962
Creator: Field, J. H.
Partner: UNT Libraries Government Documents Department
open access

Fast Neutron Flux Measurements and Analysis in SM-1 and PM-2A Core and Vessel Mockups

Description: Abstract: This technical report contains a summary of experimental and analytical work performed on cold clean SM-1 Core II with special components and PM-2A Core I each with thermal shield and vessel mockups. The purpose of this work was to define the neutron intensity and spectra to which the pressure vessels are subjected in order to assess the effect of irradiation on the vessel lifetimes. The radial distributions of the energy dependent neutron flux per unit power in the core and vessel m… more
Date: March 31, 1962
Creator: Sontheimer, K. C.; Kemp, S. N.; Lois, L.; Clancy, E. F. & McCool, W. J.
Partner: UNT Libraries Government Documents Department
open access

Hazards Report for PM-2A Core II

Description: Abstract: This technical report describes the changes incurred in the PM-2A by the planned insertion of PM-2A Core II and the replacement of the startup and check sources. PM-2A Core II components were fabricated to specifications very nearly identical to those of PM-2A Core I. The essential difference in the cores is the boron loading which permits PM-2A Core II to meet a "one-stuck rod criteria" at beginning of life. This core has been subjected to a zero power experiment and loading procedur… more
Date: June 21, 1962
Creator: Coombe, John R. & Stephenson, L. D.
Partner: UNT Libraries Government Documents Department
open access

Hazards Report for SM-1 Core II With the SM-1 Core II With the Silver-Cadmium-Indium Control Rod Absorber Section

Description: Abstract: In the March-April 1962 shutdown of SM-1 Core II, the SM-28 element will be re-inserted in SM-1 Core II and an SM-1 Core I element will be removed. An SM-1 Core II europium absorber will be replaced by a Ag-Cd-In absorber, and surveillance specimens will be inserted above the core support structure. Analysis of these changes concludes that re-insertion of the SM-2B stationary element and insertion of surveillance specimens do not affect hazards potential previously defined for SM-1.… more
Date: March 15, 1962
Creator: Stephenson, L. D.
Partner: UNT Libraries Government Documents Department
open access

Hazards Report for SM-1 Core Temperature and Flow Instrumentation (Task XIV) Covering Special Test Procedures.

Description: Abstract: Test procedures for special tests involving in-core SM-1 temperature and flow instrumentation are described (Task XIV Package Tests). These tests involve in-core steady state flow and temperature measurements, loss of flow transients, load transients, reduced primary system pressure operations and reduced element flow. The thermal and hydraulic conditions prevailing in these tests, including steady state and transient burnout rations, are developed. The effects of reduced system pres… more
Date: February 28, 1962
Creator: Bradley, P. L. & Coombe, J. R.
Partner: UNT Libraries Government Documents Department
open access

Hazards Report for Step Transient Loading Tests on the SM-1 : Task XII

Description: Abstract: This technical report evaluates hazards involved with SM- 1 plant response and system performance tests (Task XII), to determine the response of the SM-1 plant to step electrical and steam load changes. The report describes the changes in plant equipment and operating procedures for this task and evaluates these changes for possible additional hazards to those described in APAE No. 2, Revision 1, "Hazards Summary Report for the Army Package Power Reactor SM-1."
Date: February 1, 1962
Creator: Pomeroy, D. L.
Partner: UNT Libraries Government Documents Department
Back to Top of Screen