Search Results

Primary view of Army PWR Support and Development Program Six Months Summary Report : October 1, 1961 - March 31, 1962
Dixon, M. H.
May 25, 1962
Primary view of BWR Reference Design for PL-3
Humphries, G. E.
February 28, 1962
Primary view of Fast Neutron Flux Measurements and Analysis in SM-1 and PM-2A Core and Vessel Mockups
Sontheimer, K. C.; Kemp, S. N.; Lois, L.; Clancy, E. F. & McCool, W. J.
March 31, 1962
Primary view of Hazards Report for PM-2A Core II
Coombe, John R. & Stephenson, L. D.
June 21, 1962
Primary view of Hazards Report for SM-1 Core II With the SM-1 Core II With the Silver-Cadmium-Indium Control Rod Absorber Section
Stephenson, L. D.
March 15, 1962
Primary view of Hazards Report for SM-1 Core Temperature and Flow Instrumentation (Task XIV) Covering Special Test Procedures.
Bradley, P. L. & Coombe, J. R.
February 28, 1962
Primary view of Hazards Report for Step Transient Loading Tests on the SM-1 : Task XII
Pomeroy, D. L.
February 1, 1962
Primary view of Investigation of 17-4 PH Steel Components Used in SM-1, SM-1A, PM-2A Reactor Plants
Haraway, E. S. & Saccocio, R. M.
January 23, 1962
Primary view of Nuclear Measurements for Type 3 Replacement Cores for SM-1, SM-1A and PM-2A CE 3
Raby, T. M.; Walthousen, L. D.; Kemp, S. N.; McCool, W. J.; Sontheimer, K. C. & Robinson, R. A.
January 11, 1962
Primary view of PL-3 Phase I Task 3 Research and Development Report
Humphries, G. E.
March 12, 1962
Primary view of PM-2A Core II Zero Power Experiment
Walthousen, L. D.; Mageean, J. V.; Raby, T. M. & Lee, D. H.
March 30, 1962
Primary view of Power Distributions for Type 3 Replacement Cores for SM-1, SM-1A and PM-2A
Oggerino, J. P.
July 25, 1962
Primary view of PWR Preliminary Design for PL-3
Humphries, G. E.
February 28, 1962
Primary view of Shielding Measurements at the SM-1 Reactor : June 1961
Moote, F. G. & Obrist, C. H.
March 16, 1962
Primary view of Silver - Cadmium - Indium Absorber Development
Shaw, R. A. & Harris, R. L.
June 13, 1962
Primary view of SM-1 Reactor Vessel Closure Stud Investigation
Reali, D. L.
March 23, 1962
Primary view of SM-1 Shielding Analyses
Stephenson, L. D.
June 20, 1962
Primary view of Startup Testing of the PM-2A Nuclear Power Plant
McCool, W. J.; Ryan, R. M.; Richards, W. M. S.; Bradley, P. L.; Stephenson, L. D. & Cox, J. F.
March 31, 1962
Primary view of Summary Report of Analysis of Physics Measurements Performed on SM-1 Core I
Lois, L.; Paluszkiewicz, S.; Fried, B. E. & Beam, R. H.
March 30, 1962
Primary view of Summary Report of Physics Measurements on SM-1 Core I
Weiss, S. H.
February 6, 1962
Primary view of Test Program for 30 Megawatt Prototype Sodium Intermediate Heat Exchanger and Steam Generator
Alco Products (Firm).
September 14, 1962
Primary view of Thermal Analysis of SM-1 Core III
Davidson, S. L.
June 29, 1962
Back to Top of Screen