Technical Report Archive & Image Library (TRAIL) - 1 Matching Results
Search Results
- Results of Preliminary Drilling, Red Rock, Arizona
- Abstract: Structure drilling under Contract No. AT(05-l)-120 was begun May 13, 1951, and was suspended June 30, 1951, at Red Rock, Arizona with the completion of 12 holes and 2,390.5 feet of drilling. No mineralization was disclosed in the widely spaced holes. The structure and rock composition was found favorable for a potential drilling area.