Defense Logistical Support Contracts in Iraq and Afghanistan: Issues for Congress
This report examines logistical support contracts for troop support services in Iraq and Afghanistan (for Afghanistan, beginning with LOGCAP IV) administered through the U.S. Army's Logistics Civil Augmentation Program (LOGCAP). LOGCAP is an initiative designed to manage the use of civilian contractors that perform services during times of war and other military mobilizations. digital.library.unt.edu/ark:/67531/metadc505429/
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
This report presents background information and potential oversight issues for Congress on the Navy's Arleigh Burke (DDG-51) and Zumwalt (DDG-1000) class destroyer programs. The Navy's proposed FY2016 budget requests funding for the procurement of two DDG-51s. Decisions that Congress makes concerning destroyer procurement could substantially affect Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. digital.library.unt.edu/ark:/67531/metadc505623/
Navy Shipboard Lasers for Surface, Air, and Missile Defense: Background and Issues for Congress
This report focuses on potential Navy shipboard lasers for countering surface, air, and ballistic missile threats. It does not discuss the use of lasers on Navy aircraft or submarines, or the use of lasers by other military services. This report is based on unclassified, open-domain information from the Navy, industry, and research organizations such as RAND. digital.library.unt.edu/ark:/67531/metadc503545/
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
This report presents background information and potential oversight issues for Congress on the Navy's Arleigh Burke (DDG-51) and Zumwalt (DDG-1000) class destroyer programs. The Navy's proposed FY2015 budget requests funding for the procurement of two DDG-51s. Decisions that Congress makes concerning these programs could substantially affect Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. digital.library.unt.edu/ark:/67531/metadc503625/
Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress
This report provides background information and potential oversight issues for Congress on the Ohio replacement program (ORP), a program to design and build a new class of 12 ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 Ohio-class SSBNs. The Navy wants to procure the first Ohio replacement boat in FY2021, with advance procurement (AP) funding starting in FY2017. digital.library.unt.edu/ark:/67531/metadc503414/
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
This report discusses issues Congress faces regarding the Navy's proposed FY2011 budget, particularly as relating to destroyer procurement plans and programs. digital.library.unt.edu/ark:/67531/metadc503533/
Defense Logistical Support Contracts in Iraq and Afghanistan: Issues for Congress
This report examines logistical support contracts for troop support services (also known as service contracts) in Iraq and Afghanistan, primarily administered through a smaller program, the United States Air Force Contract Augmentation Program (AFCAP) and a larger program, the United States Army's Logistics Civil Augmentation Program (LOGCAP). It focuses on contracts involving Department of Defense (DOD) appropriated funds, although some projects involve a blending of funds from other agencies. digital.library.unt.edu/ark:/67531/metadc503596/
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
This report presents background information and potential oversight issues for Congress on the Navy's Arleigh Burke (DDG-51) and Zumwalt (DDG-1000) class destroyer programs. The Navy's proposed FY2015 budget requests funding for the procurement of two DDG-51s. Decisions that Congress makes concerning these programs could substantially affect Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. digital.library.unt.edu/ark:/67531/metadc503597/
Navy Aegis Ballistic Missile Defense (BMD) Program: Background and Issues for Congress
This report provides background information and issues for Congress on the Aegis ballistic missile defense (BMD) program, which is carried out by the Missile Defense Agency (MDA) and the Navy, and gives Navy Aegis cruisers and destroyers a capability for conducting BMD operations. digital.library.unt.edu/ark:/67531/metadc503570/
Navy Ohio Replacement (SSBN[X]) Ballistic Missile Submarine Program: Background and Issues for Congress
This report focuses on the Ohio replacement program as a Navy shipbuilding program. The report provides background information and potential oversight issues for Congress on the Ohio replacement program (ORP), a program to design and build a new class of 12 ballistic missile submarines (SSBNs) to replace the Navy's current force of 14 Ohio-class SSBNs. digital.library.unt.edu/ark:/67531/metadc505488/
Defense Logistical Support Contracts in Iraq and Afghanistan: Issues for Congress
This report examines logistical support contracts for troop support services in Iraq and Afghanistan administered through the U.S. Army's Logistics Civil Augmentation Program (LOGCAP). LOGCAP is an initiative designed to manage the use of civilian contractors that perform services during times of war and other military mobilizations. digital.library.unt.edu/ark:/67531/metadc503327/
DOD Leases of Foreign-Built Ships: Background for Congress
This report briefly discusses the Department of Defense leasing foreign-built ships, the opponents of this practice, and related legislation. digital.library.unt.edu/ark:/67531/metadc503490/
Navy Virginia (SSN-774) Class Attack Submarine Procurement: Background and Issues for Congress
This report provides background information and issues for Congress on the Virginia-class nuclear-powered attack submarine (SSN) program. The Navy's proposed FY2015 budget requests $5,883.6 million in procurement, advance procurement (AP), and Economic Order Quantity (EOQ) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. digital.library.unt.edu/ark:/67531/metadc503402/
Navy Virginia (SSN-774) Class Attack Submarine Procurement: Background and Issues for Congress
This report provides background information and issues for Congress on the Virginia-class nuclear-powered attack submarine (SSN) program. The Navy's proposed FY2016 budget requests $5,340.1 million in procurement, advance procurement (AP), and Economic Order Quantity (EOQ) funding for the program. Decisions that Congress makes on procurement of Virginia-class boats could substantially affect U.S. Navy capabilities and funding requirements, and the U.S. shipbuilding industrial base. digital.library.unt.edu/ark:/67531/metadc626962/
DOD Leases of Foreign-Built Ships: Background for Congress
This report briefly discusses the Department of Defense leasing foreign-built ships, the opponents of this practice, and related legislation. digital.library.unt.edu/ark:/67531/metadc627101/
Tactical Aircraft Modernization: Issues for Congress
This report provides an overview discussion on the modernization of U.S. military tactical aircraft, meaning fighter aircraft, strike fighters, and attack planes. Tactical aircraft are a major component of U.S. military capability, and account for a significant portion of U.S. defense spending. In early 2009, the Air Force, Navy, and Marine Corps collectively had an inventory of about 3,500 tactical aircraft. digital.library.unt.edu/ark:/67531/metadc627124/
Tactical Aircraft Modernization: Issues for Congress
This report provides an overview discussion on the modernization of U.S. military tactical aircraft, meaning fighter aircraft, strike fighters, and attack planes. Tactical aircraft are a major component of U.S. military capability, and account for a significant portion of U.S. defense spending. In early 2009, the Air Force, Navy, and Marine Corps collectively had an inventory of about 3,500 tactical aircraft. digital.library.unt.edu/ark:/67531/metadc627246/
Defense Acquisitions: How and Where DOD Spends Its Contracting Dollars
This report examines how much money DOD obligates on contracts, what DOD is buying, and where that money is being spent. This report also examines the extent to which these data are sufficiently reliable to use as a factor when developing policy or analyzing government operations. digital.library.unt.edu/ark:/67531/metadc627122/
Tactical Aircraft Modernization: Issues for Congress
This report provides an overview discussion on the modernization of U.S. military tactical aircraft, meaning fighter aircraft, strike fighters, and attack planes. Tactical aircraft are a major component of U.S. military capability, and account for a significant portion of U.S. defense spending. In early 2009, the Air Force, Navy, and Marine Corps collectively had an inventory of about 3,500 tactical aircraft. digital.library.unt.edu/ark:/67531/metadc627021/
Tactical Aircraft Modernization: Issues for Congress
This report provides an overview discussion on the modernization of U.S. military tactical aircraft, meaning fighter aircraft, strike fighters, and attack planes. Tactical aircraft are a major component of U.S. military capability, and account for a significant portion of U.S. defense spending. In early 2009, the Air Force, Navy, and Marine Corps collectively had an inventory of about 3,500 tactical aircraft. digital.library.unt.edu/ark:/67531/metadc627014/
Guantanamo Detention Center: Legislative Activity in the 111th Congress
This report analyzes relevant provisions in enacted legislation and selected pending bills relating to the U.S. Naval Station in Guantanamo Bay, Cuba, a facility in which alleged enemy belligerents are detained. digital.library.unt.edu/ark:/67531/metadc626891/
The Berry Amendment: Requiring Defense Procurement to Come from Domestic Sources
The Berry Amendment requires the Department of Defense (DOD) to give preference in procurement to domestically produced, manufactured, or home grown products, notably food, clothing, fabrics, and specialty metals. This report examines the original intent and purpose of the Berry Amendment, legislative proposals to amend the application of domestic source restrictions, as well as options for Congress. digital.library.unt.edu/ark:/67531/metacrs7513/
The Availability of Judicial Review Regarding Military Base Closures and Realignments
The 2005 round of military base realignments and closures (BRAC) is now underway. The Defense Base Closure and Realignment Act of 1990 (Base Closure Act), as amended, establishes mandatory procedures to be followed throughout the BRAC process and identifies criteria to be used in formulating BRAC recommendations. However, judicial review is unlikely to be available to remedy alleged failures to comply with the Base Closure Act’s provisions. This report includes a synopsis of the relevant law regarding the availability of judicial review in this context. digital.library.unt.edu/ark:/67531/metacrs7690/
Circular A-76 and the Moratorium on DOD Competitions: Background and Issues for Congress
This report discusses the current moratorium on the conduct of Department of Defense (DOD) public-private competitions under Office of Management and Budget (OMB) Circular A-76 and issues for Congress. digital.library.unt.edu/ark:/67531/metadc87147/
Circular A-76 and the Moratorium on DOD Competitions: Background and Issues for Congress
This report discusses the current moratorium on the conduct of Department of Defense (DOD) public-private competitions under Office of Management and Budget (OMB) Circular A-76 and issues for Congress. digital.library.unt.edu/ark:/67531/metadc83929/
F-35 Joint Strike Fighter (JSF) Program: Background and Issues for Congress
This report discusses the largest procurement program in the Department of Defense (DOD), the F-35 Joint Strike Fighter (JSF), also called the Lightning II. This is a new aircraft being procured in different versions for the United States Air Force, Marine Corps, and Navy. Current DOD plans call for acquiring a total of 2,456 JSFs. This report also discusses issues related to the F-35 procurement program within the FY2011 defense budget. digital.library.unt.edu/ark:/67531/metadc31395/
F-35 Joint Strike Fighter (JSF) Program: Background and Issues for Congress
The F-35 Joint Strike Fighter (JSF), also called the Lighting II, is a new strike fighter being procured in different versions by the Air Force, Marine Corps, and Navy. The F-35 program is the Department of Defense's (DOD's) largest weapon procurement program in terms of total estimated acquisition cost. The issues for Congress for FY2010 are whether to approve, reject, or modify the administration's funding request for the F-35 program, and whether to approve or reject the administration's proposal to terminate the alternate engine program. Congress' decisions on these matters will affect DOD capabilities and funding requirements and the tactical aircraft manufacturing industrial base. digital.library.unt.edu/ark:/67531/metadc26198/
Evolutionary Acquisition and Spiral Development in DOD Programs: Policy Issues for Congress
The Department of Defense (DOD) in 2001 adopted a new approach for developing major weapon systems, called evolutionary acquisition with spiral development (EA/SD), as its preferred standard. EA/SD is intended to make DOD’s acquisition system more responsive to rapid changes in military needs. EA/SD poses potentially important challenges for Congress in carrying out its legislative functions, particularly committing to and effectively overseeing DOD weapon acquisition programs. digital.library.unt.edu/ark:/67531/metacrs9304/
FY2012 National Defense Authorization Act: Selected Military Personnel Policy Issues
This report focuses exclusively on the annual defense authorization process. It does not include language concerning appropriations, veterans' affairs, tax implications of policy choices, or any discussion of separately introduced legislation. digital.library.unt.edu/ark:/67531/metadc83972/
Guantanamo Detention Center: Legislative Activity in the 111th Congress
This report analyzes relevant provisions in enacted legislation and selected pending bills relating to teh U.S. Naval Station in Guantanamo Bay, Cuba, a facility in which alleged enemy belligerents are detained. digital.library.unt.edu/ark:/67531/metadc29573/
Guantanamo Detention Center: Legislative Activity in the 111th Congress
This report analyzes relevant provisions in enacted legislation and selected pending bills relating to the U.S. Naval Station in Guantanamo Bay, Cuba, a facility in which alleged enemy belligerents are detained. digital.library.unt.edu/ark:/67531/metadc227650/
Military Uniform Procurement: Questions and Answers
Military uniforms are procured through the Defense Logistics Agency (DLA), an agency of the Department of Defense (DOD). DLA is DOD's largest combat support agency, providing worldwide logistics support for the United States (U.S.) military services, civilian agencies, and foreign countries. With headquarters in Fort Belvoir, Virginia, DLA operates three supply centers, one of which is the Defense Supply Center Philadelphia (DSCP), in Philadelphia, PA. DSCP is responsible for procuring nearly all of the food, clothing, and medical supplies used by the military; about 90% of the construction material used by troops in the field, as well as repair parts for aircraft, combat vehicles, and other weapons system platforms. According to DLA Troop Support's website, sales of goods exceeded $14.5 billion during 2009. digital.library.unt.edu/ark:/67531/metadc31437/
Military Uniform Procurement: Questions and Answers
Military uniforms are procured through the Defense Logistics Agency (DLA), an agency of the Department of Defense (DOD). DLA is DOD's largest combat support agency, providing worldwide logistics support for the United States (U.S.) military services, civilian agencies, and foreign countries. With headquarters in Fort Belvoir, Virginia, DLA operates three supply centers, one of which is the Defense Supply Center Philadelphia (DSCP), in Philadelphia, PA. DSCP is responsible for procuring nearly all of the food, clothing, and medical supplies used by the military; about 90% of the construction material used by troops in the field, as well as repair parts for aircraft, combat vehicles, and other weapons system platforms. According to DLA Troop Support's website, sales of goods exceeded $14.5 billion during 2009. digital.library.unt.edu/ark:/67531/metadc29723/
Military Uniform Procurement: Questions and Answers
Report that concerning how military uniforms are procured, legal authority for procurement, military uniform vendors, and new initiatives affecting uniform procurement. digital.library.unt.edu/ark:/67531/metadc228095/
Mine-Resistant, Ambush-Protected (MRAP) Vehicles: Background and Issues for Congress
This report covers the 2007 Department of Defense (DOD) major procurement initiative to replace most up-armored High Mobility, Multi-Wheeled Vehicles (HMMWVs) with Mine-Resistant, Ambush-Protected (MRAP) vehicles. It looks at the cost and subsequent budgets of this initiative. Among potential issues for congressional consideration are the status of older, unused MRAPS in Afghanistan that are reportedly not being used because of their size and weight; possible redundancies with the MRAP, M-ATV, and the Joint Light Tactical Vehicle (JLTV) programs; and actual Marine M-ATV requirements. digital.library.unt.edu/ark:/67531/metadc99130/
Mine-Resistant, Ambush-Protected (MRAP) Vehicles: Background and Issues for Congress
This report discusses the background and present status of Congress' involvement in the MRAP program. Topics include the deployment of MRAPs, their efficacy at reducing casualties, and possible issues of unused vehicles and redundancy. digital.library.unt.edu/ark:/67531/metadc103246/
Mine-Resistant, Ambush-Protected (MRAP) Vehicles: Background and Issues for Congress
In late 2007, the Department of Defense (DOD) launched a major procurement initiative to replace most uparmored High Mobility, Multi-Wheeled Vehicles (HMMWVs) in Iraq with Mine-Resistant, Ambush-Protected (MRAP) vehicles by FY2009. MRAPs have been described as providing significantly more protection against Improvised Explosive Devices (IEDs) than uparmored HMMWVs. DOD's decision to acquire a new, smaller MRAP variant for use in Afghanistan; MRAP mechanical, logistical, and readiness concerns could be potential policy issues for congressional consideration. This report will be updated. digital.library.unt.edu/ark:/67531/metadc26338/
Mine-Resistant, Ambush-Prtected (MRAP) Vehicles: Background and Issues for Congress
In late 2007, the Department of Defense (DOD) launched a major procurement initiative to replace most uparmored High Mobility, Multi-Wheeled Vehicles (HMMWVs) in Iraq with Mine- Resistant, Ambush-Protected (MRAP) vehicles by FY2009. MRAPs have been described as providing significantly more protection against Improvised Explosive Devices (IEDs) than uparmored HMMWVs. DOD's decision to acquire a new, smaller MRAP variant, the M-ATV, for use in Afghanistan; the disposition of MRAPs no longer needed in Iraq; and MRAP mechanical, logistical, and readiness concerns could be potential policy issues for congressional consideration. digital.library.unt.edu/ark:/67531/metadc26339/
Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress
The Navy wants to modernize 84 Aegis cruisers and destroyers over a period of more than 20 years at a potential total cost of about $9.7 billion in today's dollars. The modernizations are intended to ensure that the ships can be operated cost-effectively throughout their entire intended service lives. The program poses several potential issue for Congress. digital.library.unt.edu/ark:/67531/metacrs10690/
Military Base Closures: Role and Costs of Environmental Cleanup
No Description digital.library.unt.edu/ark:/67531/metacrs7235/
Military Base Closures: Role and Costs of Environmental Cleanup
No Description digital.library.unt.edu/ark:/67531/metacrs7236/
Military Base Closures: Role and Costs of Environmental Cleanup
No Description digital.library.unt.edu/ark:/67531/metacrs7237/
Navy Attack Submarine Force-Level Goal and Procurement Rate: Background and Issues for Congress
No Description digital.library.unt.edu/ark:/67531/metacrs7164/
Navy Attack Submarine Force-Level Goal and Procurement Rate: Background and Issues for Congress
No Description digital.library.unt.edu/ark:/67531/metacrs7165/
Costs of Major U.S. Wars and Recent U.S. Overseas Military Operations
This report presents the data on the costs of U.S. overseas military operations. Table 1 provides estimated costs of major U.S. conflicts in the 20th century. Table 2 shows the incremental costs to DOD of smaller operations within the past decade.1 Tables 3 and 4 show an annual breakdown of the incremental costs of U.S. peace and security commitments from FY1991 through FY2000, including ongoing and completed operations. digital.library.unt.edu/ark:/67531/metacrs6990/
Military Base Closures: The 2005 BRAC Commission
No Description digital.library.unt.edu/ark:/67531/metacrs7467/
Navy Ship Acquisition: Options for Lower-Cost Ship Designs - Issues for Congress
No Description digital.library.unt.edu/ark:/67531/metacrs7194/
Military Aircraft, the F/A-18EF Super Hornet Program: Background and Issues for Congress
No Description digital.library.unt.edu/ark:/67531/metacrs7257/
"Fast Track" Congressional Consideration of Recommendations of the Base Realignment and Closure (BRAC) Commission
The recommendations of the 2005 Base Realignment and Closure (BRAC) Commission will automatically take effect unless, within a stated period after the recommendations are submitted to the House and Senate, Congress adopts a joint resolution of disapproval rejecting them in their entirety. Congressional consideration of this disapproval resolution is not governed by the regular rules of the House and Senate, but by special expedited or “fast track” procedures laid out in statute. This report describes these expedited parliamentary procedures and explains how they differ from the regular legislative processes of Congress. digital.library.unt.edu/ark:/67531/metacrs7636/
The Cost of Iraq, Afghanistan, and Other Global War on Terror Operations Since 9/11
This report details the total cost of counterterrorism operations in the Global War on Terror (GWOT) since the September 2001 terrorist attacks on the United States. This report also includes descriptions of relevant budgetary legislation. digital.library.unt.edu/ark:/67531/metacrs9404/