Group 10 - The following items were shipped to Scioto Laboratory: 6 Thyratron Heater Controls (TR-1-A), 2 Switch Boxes (for P & E), 1 Log Amplifier (AM-1); 1 Pulse Generator (PG-1-B). The following are completed, tested, and awaiting transportation: 3 Two-Input B-wall Mixers (MX-2-A), 1 Pulse Generator (PG-1-B),1 Regulation Checker (RC-1) (for plating control power supplies), 1 Preamplifier (AM-2) (for Berkeley decimal scaler). The following are under construction: 6 Pulse Generators (PG-1-B) (for Health Division) (EO-508) 90%, 10 Switch Boxes (8 for P & E, Scioto, 2 for P& E, "T" Building) 85%, 6 Junction Boxes (for P&E, "T" Building, EO-486) 90%, 2 Four-Input G. M. Mixers. One on EO-17, one from Unit III. The mixers have been finished and tested for some time. The scalers (Nuclear Instrument Model 161-G) have just been received and are being modified for use with the mixers. A prototype preamplifier for the Berkeley decimal scaler was constructed and tested. Group 11 - A special pulse generator having output pulses fixed in time, and adjacent pulses variable in time with respect to the fixed pulse is under development. An initial mock-up of such a generator showed promise in that the variable pulses could be shifted in time, but there was considerable "jitter" of the pulses. A method of obtaining more positive triggering of the pulse generating circuits is being worked out. Group 12 - Three service calls were made during this period for defective G. E. induction heaters used by Group 31. Group 14- Routine counting this period included 5990 counts.