A Study of the Factors Related to Planned and Actual Manufacturing Lead Time in Two Environments: (1) High-Volume Continuous-Production and (2) Job-Shop Production-to-Order

PDF Version Also Available for Download.

Description

This study focused upon the manufacturing lead time management in California's electrical and electronic machinery, equipment, and supplies industry. Manufacturing firms with one hundred or more employees were invited to participate in the research. Six subproblems relating to manufacturing lead time were selected and six appropriate null hypotheses were tested. The subproblems identified (1) factors influencing manufacturing lead time, (2) production planning processes influencing manufacturing lead time accuracy, and (3) techniques reducing manufacturing lead time. These factors, production planning processes, and techniques were then IV investigated to determine the importance of each of them in two environments: (1) high-volume continuous-production … continued below

Physical Description

xiii, 228 leaves : ill.

Creation Information

Moshtaghi Moghaddam, Jahanguir December 1980.

Context

This dissertation is part of the collection entitled: UNT Theses and Dissertations and was provided by the UNT Libraries to the UNT Digital Library, a digital repository hosted by the UNT Libraries. It has been viewed 243 times. More information about this dissertation can be viewed below.

Who

People and organizations associated with either the creation of this dissertation or its content.

Chair

Committee Members

Publisher

Rights Holder

For guidance see Citations, Rights, Re-Use.

  • Moshtaghi Moghaddam, Jahanguir

Provided By

UNT Libraries

The UNT Libraries serve the university and community by providing access to physical and online collections, fostering information literacy, supporting academic research, and much, much more.

Contact Us

What

Descriptive information to help identify this dissertation. Follow the links below to find similar items on the Digital Library.

Degree Information

Description

This study focused upon the manufacturing lead time management in California's electrical and electronic machinery, equipment, and supplies industry. Manufacturing firms with one hundred or more employees were invited to participate in the research. Six subproblems relating to manufacturing lead time were selected and six appropriate null hypotheses were tested. The subproblems identified (1) factors influencing manufacturing lead time, (2) production planning processes influencing manufacturing lead time accuracy, and (3) techniques reducing manufacturing lead time. These factors, production planning processes, and techniques were then IV investigated to determine the importance of each of them in two environments: (1) high-volume continuous-production (HVCP) and (2) job-shop production-to-order (JSPTO).

Physical Description

xiii, 228 leaves : ill.

Language

Identifier

Unique identifying numbers for this dissertation in the Digital Library or other systems.

Collections

This dissertation is part of the following collection of related materials.

UNT Theses and Dissertations

Theses and dissertations represent a wealth of scholarly and artistic content created by masters and doctoral students in the degree-seeking process. Some ETDs in this collection are restricted to use by the UNT community.

What responsibilities do I have when using this dissertation?

When

Dates and time periods associated with this dissertation.

Creation Date

  • December 1980

Added to The UNT Digital Library

  • Aug. 22, 2014, 6 p.m.

Description Last Updated

  • Aug. 10, 2018, 9:52 a.m.

Usage Statistics

When was this dissertation last used?

Yesterday: 0
Past 30 days: 2
Total Uses: 243

Where

Geographical information about where this dissertation originated or about its content.

Publication Place

Map Information

  • map marker Place Name coordinates. (May be approximate.)
  • Repositioning map may be required for optimal printing.

Mapped Locations

Interact With This Dissertation

Here are some suggestions for what to do next.

Start Reading

PDF Version Also Available for Download.

International Image Interoperability Framework

IIF Logo

We support the IIIF Presentation API

Moshtaghi Moghaddam, Jahanguir. A Study of the Factors Related to Planned and Actual Manufacturing Lead Time in Two Environments: (1) High-Volume Continuous-Production and (2) Job-Shop Production-to-Order, dissertation, December 1980; Denton, Texas. (https://digital.library.unt.edu/ark:/67531/metadc331251/: accessed March 18, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; .

Back to Top of Screen