Federal Register, Volume 74, Number 2, January 5, 2009, Pages 201-392 Page: 228
vi, 191, ii p. ; 28 cm.View a full description of this periodical.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
Federal Register/Vol. 74, No. 2/Monday, January 5, 2009 /Rules and Regulations
TABLE 18-PERCENTAGE CHANGE, PROSPECTIVE VS. BASE PERIOD UNIT COSTS
C. Percentage
change from
Pilotage area A. Prospective B. Base period base (A di-
unit costs unit costs vided by B; re-
sult expressed
as percentage)
Area 1 ............................................ ............... $367.17 $319.44 14.94
Area 2 ......................................................261.03 159.58 63.57
Total, District One .......................................................... 314.11 225.86 39.08
Area 4 ......................................................170.93 159.17 7.39
Area 5 ......................................................457.95 369.67 23.88
Total, District Two ............................................ ...... ... 289.18 249.61 15.85
Area 6 ......................................................160.26 138.66 15.58
Area 7 ......................................................369.54 321.50 15.01
Area 8 ......................................................170.68 147.77 15.50
Total, District Three ......................................................................... 188.13 163.00 15.42
Step 8: Adjust the base period rates by rates set by the 2007 Final Rule. Table
the percentage change in unit costs in 19 shows this calculation.
Step 7. The base period rates are the
TABLE 19-BASE PERIOD RATES ADJUSTED BY PERCENTAGE CHANGE IN UNIT COSTS1
Pilotage area A. Baseperiod B. Percentage change in C. Increase in base rate D. Adjusted rate
Pilotage area rate unit costs (A(A + C, rounded to
(multiplying factor) nearest cent)
Area 1 14.94 (1.1494)
-Basic pilotage .................... ......... $13/km, $23/mi ........................................ $1.94/km, $3.44/mi $14.94/km, $26.44/mi
- Each lock transited ..................................... 288 ................ ............. 43.03 331.03
- Harbor movage ........................................ 943 ........................................ 140.89 1,083.89
-Minimum basic rate, St. Lawrence River ... 629 ........................................ 93.98 722.98
- Maximum rate, through trip ........................ 2,761 ........................................ 412.51 3,173.51
Area 2 63.57 (1.6357)
- 6-hr. period ................... ............... 477 .. .. ............................. 303.23 780.23
- Docking or undocking ................................ 455 ........................................ 289.24 744.24
Area 4 7.39 (1.0739)
- 6 hr. period ................... ............... 641 ........................................ 47.35 688.35
- Docking or undocking ................................ 494 ........................................ 36.49 530.49
-Any point on Niagara River below Black
Rock Lock ...... .............. ............. 1,261 ........................................ 93.15 1,354.15
Area 5 between any point on or in 23.88 (1.2388)-Toledo or any point on Lake Erie W. of
Southeast Shoal ............................ ..
-Toledo or any point on Lake Erie W. of
Southeast Shoal & Southeast Shoal .........
-Toledo or any point on Lake Erie W. of
Southeast Shoal & Detroit River ................
-Toledo or any point on Lake Erie W. of
Southeast Shoal & Detroit Pilot Boat .........
-Port Huron Change Point & Southeast
Shoal (when pilots are not changed at the
Detroit Pilot Boat) ..... .........................
-Port Huron Change Point & Toledo or any
point on Lake Erie W. of Southeast Shoal
(when pilots are not changed at the Detroit
Pilot B oat) ................ ...........................
-Port Huron Change Point & Detroit River ..
-Port Huron Change Point & Detroit Pilot
B oat .............................. ..... ........
-Port Huron Change Point & St. Clair River
- St. Clair River ....................1,004
1,699
2,206
1,699
2,959
3,428
2,223
1,729
1,229
1,004239.75
405.72
526.79
405.72
706.60
818.60
530.85
412.88
293.48
239.751,243.75
2,104.72
2,732.79
2,104.72
3,665.60
4,246.60
2,753.85
2,141.88
1,522.48
1,243.75228
Upcoming Pages
Here’s what’s next.
Search Inside
This issue can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Periodical.
United States. Office of the Federal Register. Federal Register, Volume 74, Number 2, January 5, 2009, Pages 201-392, periodical, January 5, 2009; Washington D.C.. (https://digital.library.unt.edu/ark:/67531/metadc132864/m1/35/: accessed April 19, 2024), University of North Texas Libraries, UNT Digital Library, https://digital.library.unt.edu; crediting UNT Libraries Government Documents Department.